Structural Remediation and Joinery Alignment
Incorrectly installed heavy joinery will inevitably cause structural failure. For this Surrey Crescent project within a multi-unit complex, we were called in to rectify a large exterior bi-fold door system. The entire heavy-duty door unit had dropped due to improper original installation rendering the doors inoperable. Our team executed a targeted remediation to address the structural failure. We removed the necessary framing elements to access the load-bearing track system and realigned the entire header structure.
Precision Adjustment and Final Execution
Large-format glass bi-fold doors require absolute level accuracy to function correctly. After securing the primary structural framework, we meticulously adjusted the roller mechanisms and hinges on each individual door panel. We verified the weight distribution across the top track to ensure smooth operation without future dragging or dropping. The completed repair restores full functionality and secures the property’s weather-tight seal.
- Remediation of a major structural failure in a multi-unit complex
- Realignment of the load-bearing header and track framework
- Precision adjustment of large-format glass bi-fold doors
- Restoration of full operational use and weather-tight integrity